One important process in development projects is concrete processing. This process must be done correctly in order to obtain truly high-quality results. Processing of concrete includes several stages, namely mixing or stirring concrete materials, transporting or transferring concrete mixtures, pouring concrete mixtures, compacting concrete mixtures, leveling concrete surfaces and concrete treatment. On the other hand, you may need the best Deputy Inspector Redlands CA when you must inspect the quality of the concrete structure in your project.

Of course, in this process tools are needed so that each stage of the work can take place more easily and quickly. In addition, the composition of the mixture for the manufacture of concrete must also be appropriate to obtain the expected strength.

Following are the important steps in concrete casting:

Mixing or Stirring Concrete Materials

Basically, concrete is made by mixing three main ingredients, namely cement, aggregate, and water. For aggregates, there are two types of aggregates commonly used, namely gravel as coarse aggregate and sand as fine aggregate.

Transport or transfer of concrete mixtures

If the concrete material has been stirred to a perfect level, the next step is to transport the concrete mixture to the pouring place. This process must be carried out quickly before the cement reacts with water.

For small scale, concrete mixes can be transported using buckets or push carts. While for large scale, concrete mixes are usually transported using concrete stirring trucks, pumps or by using conveyor belts. If the distance between the location of mixing concrete and pouring is quite far, it is generally used as a form of concrete stirring truck.

Cast concrete pouring

Good concrete results are obtained from the correct pouring method of concrete. The pouring process must be carried out quickly so that the concrete mixture is always in plastic condition and can flow smoothly to the cavity between the reinforcement. This pouring starts from the lowest formwork angles. Concrete mixers should not be put into formwork with a distance of more than 2 m. If it exceeds the maximum distance of 2 m, it can result in segregation. Use terms or funnels if the distance exceeds the maximum height.